Mechanical & Electrical

We undertake full design and installation packages of all mechanical and electrical systems including pipework, power distribution, drainage and emergency lighting.

Case Study

Bishop StortfordHerts and Essex Hospital

  • Client Name:  Herts and Essex Hospital
  • Contract Admin:  Imagile Professional Services
  • Design Team:  Clancy Consulting
  • Form of Contract:  JCT Design and Build
  • Completion Date:  March 2019
  • Programme Duration:  18 Months

Product Overview

BSN Provided a warm and comfortable environment during the winter with safe domestic water throughout the year. All works were undertaken on programme with minimal disruption to the hospital. The works were well managed and communicated to ensure all areas were available to the hospital when undertaking the works.Working in a live environment, BSN managed staff and patients to provide temporary service sensuring the continuation of service to the hospital. BSN provided daily work schedules and easy to understand visuals, which enabled BSN to cause minimal disruption to the hospital. Upon completion of each area, BSN undertook water treatment to the low-temperature hot water and chlorination in accordance with HTM guidelines.

BSN installed a water booster set to ensure the correct pressures were distributed throughout the hospital. The installation has improved the workings of the system with constant heating temperature smaintained as well as the correct hot and cold water temperatures and flow rates at all outlets.Further to this, BSN was engaged to provide full fire damper audit and testing in accordance with BS 9999 and HTM 03-01. The installation quality was signed off by Clancy Consulting, and the Chlorination & HTM compliance was signed off by ISHEM Consulting.